Rework risks triggers in the Nigerian construction industry: a view of built environment professionals

Main Article Content

Emmanuel Chididebere Eze
John Ebhohimen Idiake
Bashir Olanrewaju Ganiyu
صندلی اداری

Abstract

Rework is systemic and a recurring decimal and It is triggered by several factors, which emergence create scenarios, which degrades project cost, quality and schedule performance, and overall project performance. This study therefore examined the perception of construction professionals on the factors that triggers the emergence of rework in the Nigerian construction industry. This was achieved by determining the predominant rework triggers that affect project performance, identifying rework triggers in which the professionals view varies significantly, and examining the category of rework risks triggers that contribute more to rework incidences. The study adopted a quantitative survey approach in which structured questionnaire was adopted as the research instrument. Mean item score was used in ranking the professionals perception on rework triggers, and Kruskal-Wallis H test was used to identify the variables in which the professionals view varies. The study concluded that: contractor-related and design-related causes are the major categories of rework risks triggers. Unclear instruction to workers, Shortage of skilled supervisors, incomplete and inaccurate information are the predominant triggers of rework. The professionals view varies significantly on nine factors which cut across the four categories of rework triggers. It was recommended that there is need for clarity, effectiveness and timeliness of instruction and information dissemination among project participants, and the use of skilled and experienced professionals, skilled supervisors and proper implementation of quality management practices by both the design consultant and contractor throughout the project’s phases

Downloads

Download data is not yet available.

Article Details

Section
Articles
Author Biographies

Emmanuel Chididebere Eze, Federal University Of Technology Minna

Eze Emmanuel Chidiebere is a Postgraduate Student of Quantity Surveying, Federal University of Technology Minna, Niger State, Nigeria. He holds National Diploma (ND) and B.Tech (Hons) in Quantity Surveying. He has over 6 years field experience with a frontline International Construction Company in Abuja,Nigeria. He is a certified Project Management Professional, PMP. He awaits Induction into the corporate membership cadre of the Nigerian Institute of Quantity Surveyors, NIQS. His research interests include Quantity surveying, Productivity and performance evaluation, Project management with specific emphasis in Cost, Schedule, Risk and Quality, Procurement, stakeholders’ management

John Ebhohimen Idiake, Federal University Of Technology Minna

Dr. Idiake John Ebhohimen is an Associate Professor and the current Head of Quantity Surveying Department, Federal University of Technology, Minna, Nigeria.  He holds B.Tech (Hons) in Quantity Surveying from River State University of Science and Technology, M.Tech in Construction Management from Federal University of Technology Minna and PhD (Construction Management) from Ahmadu Bello University, Zaria, Nigeria. Dr. J. E. Idiake   has research interest in Project performance Measurement, Quantity Surveying, Construction Management, Construction risks and Safety and Cost Modelling. Dr. J. E. Idiake is a corporate member of the Nigerian Institute of Quantity Surveyors (NIQS) and Registered Quantity Surveyor (RQS) with Quantity Surveying Registration Board of Nigeria, QSRBN.

Bashir Olanrewaju Ganiyu, Federal University Of Technology Minna

Dr. Bashir Olanrewaju Ganiyu is a Lecturer I in the Department of Quantity Surveying, Federal University of Technology Minna, Nigeria. He holds B.Tech (Hons) in Quantity Surveying from Federal University of Technology Minna, Msc. (Construction Management) from Ahmadu Bello University Zaria, Nigeria. He obtained his PhD from Cape Peninsula University of Technology, South Africa. Dr. Ganiyu research interest in Costing and Management of Sustainable Housing, Construction Resources Optimization, Cost Modelling, Construction Economics and Management, and Performance Evaluation. Dr. Ganiyu is a Corporate Member of The Nigerian Institute of Quantity Surveyors (NIQS) and he is a Registered Quantity Surveyor and Consultant (RQS), having registered with Quantity Surveyors Registration Board of Nigeria (QSRBN)

References

ABDUL-RAHMAN, I.; MEMON, A. H.; ABD-KARIM, A. T. (2013) Significant factors causing cost overruns in large construction projects in Malaysia. Journal of Applied Sciences, v. 13, n. 2, p. 286-293. Available: http:// http://docsdrive.com/pdfs/ansinet/jas/2013/286-293.pdf. Access: 7th July, 2016. DOI: 10.3923/jas.2013.286.293

AJAYI, O.; OYEYIPO, O. (2015) Effect of rework on project performance in building project in Nigeria. International Journal of Engineering Research & Technology (IJERT), v. 4, n. 2, p. 294-300.

ALRECK, P. L.; SETTLE, R. B. (1985) The survey research handbook. Richard D. Irwin, Inc., Homewood, Ill.

ANIL, A.; DANIELRAJ, R. C. (2016) Analyze the causes and minimize the occurrence of rework in construction project. International Journal of Innovative Research In Science, Engineering & Technology, v. 5, n. 4, p. 6464-6467. Available: https://www.ijirset.com/upload/2016/april/253_MY%20JOURNAL_M.pdf. Access: 5/01/2017. Doi:10.156 80/Ijirset.2016.0504253

BARBER, P.; GRAVES, A.; HALL, M.; SHEATH, D.; TOMKINS, C. (2000) Quality failure costs in civil engineering projects. International Journal of Quality and Reliability Management, v. 17, n. 4/5, p. 479–492.

CUSACK, D. (1992) Implementation of ISO 9000 in construction. ISO 9000 Forum Symposium, the International Group for Lean Construction. Gold Coast, Australia, p. 157-167.

DALTY, C. D.; CRAWSHAW, D. T. (1973) Working Drawings in Use, Building Research Establishment, Current Paper CP 18/73, Watford, UK.

DAVIS, K.; LEDBETTER, W. B.; BURATTI, J. L. (1989) Measuring design and construction quality costs. ASCE Journal of Construction Engineering and Management, v. 115, n. 3, p. 389–400.

ENSHASSI, A.; SUNDERMEIER, M.; ZEITER, M. A. (2017) Factors Contributing to Rework and their Impact on Construction Projects Performance. International Journal of Sustainable Construction Engineering & Technology, v. 8, n. 1, p. 12-33.

FANIRAN, O. O.; LOVE, P. E. D.; LI, H. (1999) Optimal allocation of construction planning resources. ASCE Journal of Construction Engineering and Management, v. 125, n. 5, p. 311-319.

FELLOWS, R. R.; LIU, A. (2008) Research Methods for Construction, 3rd Edition. Wiley- Blackwell Science, London.

GHASEMI, A.; ZAHEDIASL, S. (2012) Normality Test for Statistical Analys is: A guide for non- statisticians. International Journal of EndocrinolMetab, v. 10, n. 2, p. 486-489.

HWANG, B. G.; THOMAS, S. R.; HAAS, C. T.; CALDAS, C. H. (2009) Measuring the Impact of Rework on Construction Cost Performance. Journal of Construction Engineering and Management, v. 135, n. 3, p. 187-198.

IRELAND, V. (1985) The role of managerial actions in the cost, time and quality performance of high rise commercial projects. Construction Management and Economics, v. 3, n. 1, p. 59-87.

JOSEPHSON, P. E.; HAMMARLUND, Y. (1999) The causes and costs of defects in construction: A study of seven building projects. Automation in Construction, v. 8, n. 6, p. 681–687.

JOSEPHSON, P.; LARSSON, B.; LI, H. (2002) Illustrative benchmarking rework and rework costs in Swedish construction industry. Journal of Management Engineering, v. 18, n. 2, p. 76-83.

KREJCIE, R. V.; MORGAN, D. W. (1970) Determining Sample Size for Research Activities. Educational and Psychological Measurement, v. 30, p. 607-610.

LOVE, P. E. D. (2002a) Influence of project type and procurement Method of Rework Costs in Building Construction Projects. Journal of Construction Engineering and Management, v. 128, n. 1, p. 1-29.

LOVE, P. E. D. (2002b) Auditing the indirect consequences of rework in construction: a case based approach. Managerial Auditing Journal, v. 17, n. 3, p. 138–146.

LOVE, P. E. D.; LI, H. (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics, v. 18, n. 4, p. 479–490.

LOVE, P. E. D.; MANDAL, P.; LI, H. (1999a) Determining the causal structure of rework in construction projects. Construction Management and Economics, v. 17, n. 4, p. 505–517.

LOVE, P. E. D.; EDWARDS, D. (2004a) Determinants of Rework in Building Construction Projects. Engineering, Construction and Architectural Management, v. 11, n. 4, p. 259 -274.

LOVE, P. E. D.; SMITH, J. (2003) Benchmarking, bench-action and bench-learning: rework mitigation in projects. ASCE Journal of Management in Engineering, v. 19, n. 4, p. 147-159.

LOVE, P. E. D.; DAVIS, P. R.; ELLIS, J. M.; CHEUNG, S. O. (2010) Dispute causation: Identification of Pathogenic Influences. Engineering, Construction and Architectural Management, v. 17, n. 4, p. 404-423.

LOVE, P. E. D.; HOLT, G. D.; SHEN, L. Y.; LI, H.; IRANI, Z. (2002) Using systems dynamics to better understand change and rework in construction project, management systems. International Journal of Project Management, v. 20, n. 6, p. 425-436.

MAHAMID, I. (2016) Analysis of Rework in Residential Building Projects in Palestine. Jordan Journal of Civil Engineering, v. 10, n. 2, p. 197-208.

MAROSSZEKY, M. (2006) Performance Measurement and Visual Feedback for Process Improvement. A Special Invited Lecture presented in the SMILE-SMC 3rd Dissemination Workshop. Centre for Infrastructure and Construction Industry Development of the University of Hong Kong, Hong Kong.

MASTENBROEK, Y. C. (2010) Reducing rework costs in construction projects. Published Bsc thesis, University of Twente, San Pedro Sula, Honduras. Available: http://purl.utwente.nl/essays/59691. Access: 10/12/2016.

MESHKSAR, S. (2012) Cost And Time Impacts Of Reworks In Building A Reinforced Concrete Structure. Master Thesis. North Cyprus, Gazimagusa: Eastern Mediterranean University. Available: http://hdl.handle.net/11129/290. Access: 10/12/2016.

MOHAMED, M. B. I. (2015) A Study Of Project Delay In Sudan Construction Industry. Published Msc thesis, Universiti Tunku Abdul Rahman. Available: http://eprints.utar.edu.my/1619/1/Microsoft_Word_-_A_STUDY_OF_PROJECT_DELAY_IN_SUDAN.pdf. Access :June 1, 2017.

OMRAN A.; ABDALRAHMAN S.; PAKIR A. (2012) Project Performance in Sudan Construction Industry: A Case Study. Academic Research Journals (India), v.1, n.1, p. 55-78.

OYEWOBI, L. O.; OGUNSEMI, D. R. (2010) Factors influencing rework occurrence in construction: A study of selected building projects in Nigeria: Journal of Building Performance, v. 1, n. 1, p. 1-20.

PALANEESWARAN, E. (2006) Reducing Rework to enhance Project Performance Levels, Proceedings of the one day Seminar on Recent Developments in Project Management in Hong Kong.

ROGGE, D. F.; CAUSES, U. O. T. A. A. C. I. I.; TEAM, E. O. F. R. R.; UNIVERSITY, O. S. (2001) An investigation of field rework in industrial construction. Report No. RR153-11, CII, Austin, Texas.

ROUNCE, G. (1998) Quality, waste, and cost consideration in architectural building design management. International Journal of Project Management, v. 16, n. 2, p. 123-127.

SAIDU, I.; SHAKANTU, W. M. W. (2016c) The contributions of Material Waste to project-cost Overrun in Abuja, Nigeria. Acta Structilia, v. 23, n. 1, p. 99-113.

SAIDU, I.; SHAKANTU, W.M.W. (2016a) A Study of the Relationship between Material W aste and Cost Overruns in the Construction Industry. The 9th CIDB Postgraduate Conference Cape Town, South Africa. Emerging trends in construction organisational practices and project-management knowledge area. Edited WINDAPO, A. O. p. 124-134, Feb, 2-4, 2016.

SIMPEH, E. K. (2012) An Analysis of the Causes and Impact of Rework in Construction Projects. A Thesis submitted Cape Peninsula University of Technology, South Africa. Available: http://hdl.handle.net/11189/1054. Access: 10/12/2016.

SMALLWOOD, J. J. (2000) A study of the relationship between occupational health and safety, labour productivity and quality in the South African construction industry. Published PhD (Construction Management) thesis, University of Port Elizabeth, Port Elizabeth. Available: http://hdl.handle.net/20.500.11892/155953. Access: 1/12/2016.

SPACEY, J. (2016) What is a Risk Trigger? Available: http://simplicable.com/new/risk-trigger, Access: 8th March, 2017.

The NEA Research Bulletin (1960) Small-Sample Techniques. v. 38, p. 99.

THODE, H.C. (2002) Testing for Normality. Marcel Dekker, New York. Available: http://dx.doi.org/10.1201/9780203910894.

WALKER, D. H. T. (1994) An investigation into the factors that determine building construction time performance. PhD thesis, Department of-Building and Construction Economics, Faculty of Environmental Design and Construction, Royal Melbourne Institute of Technology, Melbourne, Australia. Available: http://dx.doi.org/10.1080/01446199500000030. Access: 7th October, 2016.

WASFY. M. A. F. (2010) Severity and impact of reworking, a case study of a residential commercial tower project in the Eastern Province-KSA. Master Thesis. Dhahran, Saudi Arabia: King Fahd University of Petroleum & Minerals, p. 1-122.

فروشگاه اینترنتی